AX Core Setup from A to Z
Follow the steps below in the order given.
1. Install the SmartgridOne hardware
2. Connect with the commissioning interface
3. Setting the grid system and current limits
4. Set location
5. Setting up the PV panel configuration
6. Add grid energy meter
7. Add devices
8. Grouping Devices
9. Setting the control modes
10. Linking with your AX Core app account
11. Extension Modules (Optional)
12. Mobile App Manual
13. Extra information
14. General troubleshooting